Building Material Advanced Sunscreen Roof Coating for Ultimate Heat Protection

Product Details
Customization: Available
Feature: Heat Insulation
Colour: White
Still deciding? Get samples of US$ 1.5/kg
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make at Made-in-china.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
In-stock Capacity
The supplier has In-stock capacity
Flexible Customization
The supplier provides Flexible customization services for your Personalized requirements
ODM Services
The supplier provides ODM services
to see all verified strength labels (13)
  • Building Material Advanced Sunscreen Roof Coating for Ultimate Heat Protection
  • Building Material Advanced Sunscreen Roof Coating for Ultimate Heat Protection
  • Building Material Advanced Sunscreen Roof Coating for Ultimate Heat Protection
  • Building Material Advanced Sunscreen Roof Coating for Ultimate Heat Protection
  • Building Material Advanced Sunscreen Roof Coating for Ultimate Heat Protection
  • Building Material Advanced Sunscreen Roof Coating for Ultimate Heat Protection
Find Similar Products

Basic Info.

Model NO.
RS-1-7
Function
Heat Insulation
Sample Fee
Free Samples, Buyer Pays for Shipping
Transport Package
Plastic Bucket
Specification
Multiple specifications
Trademark
RISING
Origin
Guangzhou, China
HS Code
3208201090

Packaging & Delivery

Package Size
32.00cm * 32.00cm * 38.00cm
Package Gross Weight
20.500kg

Product Description

Building Material Advanced Sunscreen Roof Coating for Ultimate Heat ProtectionBuilding Material Advanced Sunscreen Roof Coating for Ultimate Heat ProtectionBuilding Material Advanced Sunscreen Roof Coating for Ultimate Heat Protection
Building Material Advanced Sunscreen Roof Coating for Ultimate Heat Protection
Waterproof,Adiabatic Coating
  1. Product overview
The coating is based on high quality acrylic polymer emulsion and a variety of additives and pigment fillers,which is a new one - component waterproof coating.The film formed by the product has excellent water resistance, acid and alkaline resistance, flexibility and adhesion,which is highly reflective to the solar infrared and visible light from 400nm to 1500nm.Avoiding heat accumulation on the surface to keep the cool temperature.Water-based environmental protection product,USAGE:Open the cover and stir evenly,easy to construct.
  1. Implementation standards: JC/T375-2012
  2. Range of application:

Metal surface,color steel tile,zinc iron tile,aluminium zinc plate,plastic tile,concrete surface and all structures that need waterproof and heat insulation.

  1. Construction method
  1. Requirements for base surface: smooth, clean, ,firm,no stains or rust, no free water.
  2. Mix the paint evenly before using a spray brush, roller or brush.Do not dilute with water.Polyester nonwoven or fiberglass fabric is recommended for strengthening layer.
  3. Before constructing large area,use polyester nonwoven or fiberglass fabric to strengthen these details: pipe root,external corner,internal corner,contraction joint,outfall...
  4. Construction thickness and coating dosage:
Paint three times with a layer of polyester nonwoven or fiberglass fabric: 2.5-3kg/square meter
Large area spraying:1-1.5kg/square meter(1.0 mm thickness)
Specific dosage is related to thickness and base layer.
  1. Each construction must wait for the upper coating dry,Do not soak the film until it is dry.Make sure the waterproof layer is completely dry before soaking in water.The drying time should be extended properly under the condition :low temperature ,high humidity,enclosed environment.
  2. The closed-water test must be carried out after the film is completely dried.
  3. Carry out construction and acceptance inspection in accordance with relevant national regulations.
  1. Matters needing attention
  1. Do not construct when: the temperature is below 5ºC,the base is moist,wet weather.
  2. Stored in cool and dry place at 5-35ºC.
  3. Quality guarantee period:12 months.
  4. Specification: 20±0.15kg/ barrel.
  5. Transportation: Transported as non-dangerous goods.
  6. Building Material Advanced Sunscreen Roof Coating for Ultimate Heat ProtectionBuilding Material Advanced Sunscreen Roof Coating for Ultimate Heat Protection

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now